The following installation manuals are available for the Vision Overhead Radiant U-tube Heater 45kW 9.4m long (Nat Gas) (VS45UTEN):
Vision Natural Gas - Installation Manual - February 2020,
Vision Ducted Air - Installation Manual,
VS Radiant - Installation Manual - August 2024,
VS Radiant (Propane) - Installation Manual - August 2024,
Reznor, Accessory, Vision Accessories Manual, EN 2018-12,Iss A